Construction



A pump test measuring box consists of two parts, an upper part and a top.

In the upper part all water-leading componennts are installed. The water delivered passes through the PV-measuring box from the right to the left sight. In inductive flowmeter serves for measuring the flowing amount, which can be regulated to a value wished via a valve (manual or electronical valve).

The water delivered partly passes a measuring pot tandem-arranged. There several sensors are installed for measuring the physical/chemical parameters (e.g. conductivity, oxygen...). The flowing can be controlled by another valve.

In the top the measuring and registration devices are installed as well as the power supply. All sensors in the measuring pot and the flowmeter are connected with a registration device via cable.

A power pack with a uninterruptible power supply (UPS) supplies the power required for the entire box and the probes connected

PV-
Measuring box

The total performance on-site

Further informations:
PV-Measuring box - surview
Data logger
Variants

GSG Geologie-Service GmbH, Am Sand 9, 97080 Wuerzburg,

Tel.: ++49/(0)931/99105-80, FAX: ++49/(0)931/99105-90,
messtechnik@geologie-service.de